engineering economics A bridge will be maintained for a very long time. Each year the annual cleaning cost is A-annual. Every five year there is a big refresh (in addition

engineering economics A bridge will be maintained for a very long time. Each year the annual cleaning
cost is A-annual. Every five year there is a big refresh (in addition to the annual)
The cost is A-five year. Finally every 24 years there is a heavy duty refresh costing
A-twenty four. is the Capitalized Cost for this system?
O Cap Cost = A-Annual* (PIA i 1) + A-five year *(PIA i 5) +A-twenty four *(PIAi 24)
O Cap Cost = A-Annual/i + A-five year*(A|P i 5)/i +A-twenty four*(A|P i 24)/i
O Cap Cost = A-Annual/i + A-five year *(A|Pi 5)/5*i + A-twenty four*(A|Pi 24)/24*i
Cap Cost = A-Annual /i +A-five year *(P | AI % )/i +A-twenty four*(PIA I 24)/i
O Cap Cost = A-Annual + A-five year/5 +A-twenty four/24

Do you need us to help you on this or any other assignment?


Make an Order Now
0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published.