As a member of the Information Security team at a small coll…

As a member of the Information Security team at a small college, you have been made the project manager to install an access control system (ACS) in a dormitory. The ACS will automatically unlock the dormitory doors via an electronic proximity reader and integrate with an existing security camera system.  The cameras are designed to face and rotate to record a person as they use their identification card to unlock the door. Create a 3-4 page project plan for this project in which you: Your assignment must: The specific Course Learning Outcomes associated with this assignment are: Purchase the answer to view it Purchase the answer to view it

Introduction

The purpose of this project plan is to outline the process and steps involved in installing an access control system (ACS) in a dormitory at a small college. The ACS will utilize electronic proximity readers to automatically unlock dormitory doors when a valid identification card is presented. Furthermore, the ACS will be integrated with an existing security camera system, which will capture footage of individuals as they use their identification card to unlock the door. This project plan will detail the objectives, deliverables, timeline, and resources required for the successful implementation of the ACS in the dormitory.

Objectives

The primary objective of this project is to install an ACS in the dormitory, enabling automated and secure access for authorized individuals. The specific objectives include:

1. Install electronic proximity readers on all dormitory doors: This will require the physical installation of the proximity readers and the necessary wiring infrastructure to connect them to the ACS.

2. Integrate the ACS with the existing security camera system: The ACS will be connected to the security cameras to capture footage of individuals as they unlock the doors using their identification cards.

3. Develop a central control system: A central control system will be developed to manage and administer access privileges for the dormitory. This will include user authentication, access level assignments, and monitoring capabilities.

Deliverables

The following deliverables will be produced as part of this project:

1. Installed electronic proximity readers on all dormitory doors: This will provide automated access control and entry for authorized individuals.

2. Integrated ACS with the existing security camera system: The ACS will be seamlessly connected to the security cameras, allowing for comprehensive monitoring and recording of access events.

3. Developed central control system: A centralized software system will be developed to manage and administer access privileges, including user authentication, access level assignments, and monitoring capabilities.

Timeline

The following timeline outlines the key milestones and activities for this project:

Week 1-2: Project Initiation and Planning
– Determine project objectives and scope
– Identify and engage project stakeholders
– Develop project plan

Week 3-4: Procurement and Installation
– Procure electronic proximity readers and necessary wiring infrastructure
– Coordinate with dormitory management for access to install ACS
– Physically install proximity readers on dormitory doors

Week 5-6: Integration with Security Camera System
– Conduct necessary compatibility testing between ACS and security cameras
– Configure ACS and security camera system integration
– Test and verify integration functionality

Week 7-8: Development of Central Control System
– Develop centralized software system for managing access privileges
– Implement user authentication and access level assignments
– Integrate monitoring capabilities into the central control system

Week 9-10: Testing and Training
– Conduct system testing to ensure proper functioning of ACS and security camera integration
– Provide training to dormitory staff on how to use the ACS and central control system
– Address any issues or concerns identified during testing and training

Week 11-12: Project Closure and Handover
– Conduct final project review and evaluation
– Document and communicate project outcomes
– Handover project to appropriate personnel for ongoing maintenance and support

Resources

The following resources will be required for the successful implementation of the ACS in the dormitory:

1. Electronic proximity readers: The required number of proximity readers will need to be procured for installation on each dormitory door.

2. Wiring infrastructure: The necessary wiring infrastructure will be required to connect the proximity readers to the ACS.

3. Security camera system: The existing security camera system will need to be compatible with the ACS and have the capability to integrate with it.

4. Central control system software: A software system will need to be developed to manage and administer access privileges for the dormitory.

5. Project team: A project team will be required to oversee and carry out the installation, integration, and development tasks outlined in this plan.

Conclusion

This project plan outlines the objectives, deliverables, timeline, and resources required for the successful implementation of an ACS in the dormitory. By installing electronic proximity readers, integrating with an existing security camera system, and developing a central control system, the dormitory will benefit from automated and secure access for authorized individuals. The outlined timeline and resource requirements provide a structured framework for managing the project and ensuring its successful completion.